[ Review to be collected ]
Commercial
Commercial paving.
Forecourts, yards, access roads and hardstanding — built for the vehicles that actually use them, and phased so you stay open while we work.
- Typical scope
- Forecourts, yards, access roads, hardstanding
- Design input
- Vehicle types and daily movements
- Drainage
- Designed system with a consented outfall
- Programme
- Phased to keep the site operational
- Written, itemised quotesExcavation, sub-base, edging and drainage priced separately
- Site survey before pricingNobody prices a driveway properly from a satellite photo
- Compliant surface water drainageBuilt to meet the 2008 permeable-surface rules, not around them
- Local installers onlyCrews working their own patch, not a national call centre
Commercial paving differs from domestic work in two ways that matter more than size. The build-up is designed around traffic loading rather than around a family car, and the programme has to keep the site working, because a business that cannot take deliveries for a week has lost more than the paving cost.
We price this work against a written specification rather than from a walk round, so that competing tenders are comparable and so that nothing is discovered halfway through.
A surface taking delivery lorries, refuse vehicles or plant needs a fundamentally different structure from one taking cars — deeper sub-base, a bound base course, and in some cases a reinforced concrete slab. Laying a domestic build-up on a commercial site produces rutting within months, usually where vehicles turn and where they stand. The area on the drawing does not tell you any of that; the vehicle schedule does.
What we need to price it properly
The more of this that exists up front, the more accurate and the more comparable every tender you receive will be.
- A site plan with levels
Existing levels and falls, and where surface water currently discharges. Without levels, any drainage design is guesswork.
- A vehicle schedule
What uses the surface and how often. Cars only, vans, 7.5t, artics, forklifts, refuse vehicles. This is the single most important input to the build-up.
- Ground information
Trial holes or a previous investigation if one exists. On a commercial area this is cheap relative to the risk of finding made ground after mobilisation.
- Operational constraints
Which areas must stay open, delivery windows, out-of-hours access, and whether night or weekend working is available.
- Drainage consent position
Where the outfall is and whether discharge into it is already permitted. Establishing this before tender avoids a redesign afterwards.
Surfaces for commercial use
Bitmac in two or three layers is the standard for access roads and yards, and it is the most economical way to cover a large area at load. Heavy-duty concrete block paving is used where vehicles stand and turn repeatedly, because point loads and turning shear damage bitmac over time and blocks can be lifted and relaid for services.
Reinforced concrete is the answer for the heaviest static loading — skip yards, plant standing, and areas taking tracked machines. It is the most expensive to lay and the least forgiving to alter.
Permeable systems are increasingly required on new commercial hardstanding by planning conditions, and they need designing into the drainage strategy rather than substituted in at the end.
FAQ
Common questions.
Can you work outside business hours?
Yes, where the site allows it — evenings and weekends are often the only sensible way to resurface a working forecourt or yard. It costs more per hour and usually less in total, because the alternative is closing.
How is commercial paving priced?
Against a written specification, as measured rates for excavation, disposal, sub-base, bound layers, drainage and surfacing, with a total built up from them. Rates let you check the price and let a change in quantity be handled fairly. A single lump sum with no build-up cannot do either.
Do you handle the drainage design?
We can specify and install standard surface water solutions, and for anything requiring a formal drainage design or a discharge consent we work to a drainage engineer's design. Establishing where the outfall is and whether discharge is permitted needs settling before construction, not during.
Can you phase the work to keep us trading?
Yes, and it should be in the scope from the start rather than added as a request afterwards. Phasing affects the price and the programme, so a tender that has not allowed for it is not comparable with one that has.
Related pages
Reviews
What customers say.
PaveLocal is a new name and we are not going to show you reviews we have not earned. These slots fill with real, verifiable reviews as jobs are completed — name, town, and a link you can check.
[ Review to be collected ]
[ Review to be collected ]
Written and reviewed by the PaveLocal team. We build and specify driveways across Northamptonshire, Buckinghamshire and Bedfordshire. Pricing and specification guidance on this page reflects what these jobs cost and involve in this region, not a national average.
Free quote
Get a free quote.
Send your postcode and a rough size and we will arrange a survey. A photo of what is there now tells us more than a paragraph does.
- Itemised, in writingExcavation, sub-base depth, edging, drainage and surface priced as separate lines, so you can compare quotes properly.
- Surveyed before it is pricedGround conditions decide the cost of a driveway. Anyone quoting a firm price off a photo is guessing.
- No obligationA quote is a quote. If you use someone else, that is fine — we will not chase you about it.
Prefer to talk it through? Call 07346 814806 or email hello@pavelocal.co.uk.